• Welcome
  • About
  • Portfolio
  • Recognition
  • Contact
Menu

B & F Consulting

2805 Tobermory Ln
Raleigh, NC, 27606
919-618-0180
Engineering Design Services

Your Custom Text Here

B & F Consulting

  • Welcome
  • About
  • Portfolio
  • Recognition
  • Contact
Haywood_Community_College elevation from SE.JPG

Haywood Community College

Haywood Community College, Creative Arts Building – Clyde, NC (2010-2013)

 

•    Civil Engineering design and construction administration of a 41,000 square foot education lab building with a construction cost of $9,193,000.

 

•    Existing site was a heavily wooded south-facing hill with proposed architectural design requiring solar access and daylighting opportunities with natural ventilation and the retention of as many existing trees as possible.

 

•    Included design for a roof rainwater capture system for flushing and irrigation reuse and a deck overlooking the stormwater sand filter treatment area feature.

 

•    Additional design included demolishing the existing adjacent building and parking area.

 

•    Deliverables included preliminary site layout options, Construction Drawings, Construction Administration and As-Built record set.

 

•    The Creative Arts Building is expected to be certified as the first LEED Platinum Higher-Education classroom/lab building in North Carolina.

 

Haywood Community College

Haywood Community College, Creative Arts Building – Clyde, NC (2010-2013)

 

•    Civil Engineering design and construction administration of a 41,000 square foot education lab building with a construction cost of $9,193,000.

 

•    Existing site was a heavily wooded south-facing hill with proposed architectural design requiring solar access and daylighting opportunities with natural ventilation and the retention of as many existing trees as possible.

 

•    Included design for a roof rainwater capture system for flushing and irrigation reuse and a deck overlooking the stormwater sand filter treatment area feature.

 

•    Additional design included demolishing the existing adjacent building and parking area.

 

•    Deliverables included preliminary site layout options, Construction Drawings, Construction Administration and As-Built record set.

 

•    The Creative Arts Building is expected to be certified as the first LEED Platinum Higher-Education classroom/lab building in North Carolina.

 

Summary Block
This block is invalid. Please check the block settings and try again.
Featured
Aenean eu leo Quam
Aenean eu leo Quam

Quisque iaculis facilisis lacinia. Mauris euismod pellentesque tellus sit amet mollis.

Read more →

© 2015-2016 B&F Consulting, Inc. | Powered by Squarespace