IMG_5410.JPG

NC Ferries

Cherry Branch Ferry Operations Center and Sitework – Craven Co, NC (2011-2015)

Swan Quarter Ferry Operations Center and Sitework – Hyde County, NC (2011-2015)

 

•    Roof rainwater capture system
    -    Removes additional impervious area from point source flow into harbor
    -    Provides beneficial reuse of natural resources for toilet flushing and irrigation at new operations center


•    Stormwater infiltration
    -    Retrofit infiltration trenches into existing stormwater swale to allow more infiltration and reduce nitrogen load into harbor
    -    Routing of stormwater through overland grassy swales to allow greater infiltration and to reduce nitrogen load into harbor
    -    Routing of overflow building downspouts through planned landscaping to utilize the natural rainwater in the root systems of the native plantings


•    On-site septic system (Cherry Branch site only)
    -    Utilize LPP septic system to pressure dose the new septic field on site
    -    Designed overexcavation of trenches to provide chimneys for septic effluent to infiltrate better into the existing sandy soils layer approximately 4.5’ below the ground surface 


•    Removal of on-site septic system (Swan Quarter site only)
    -    Designed new force main to remove wastewater from current site septic system and tie to public sanitary district for treatment


•    Net Zero Discharge from Ferry Boat planning
    -    Designed ferry boat removal system whereby waste from the ferry restrooms would be pumped onto shore through a designed system and into the on-site septic system as discussed above
    -    Removing point source discharges into the river shellfish waters

 

NC Ferries

Cherry Branch Ferry Operations Center and Sitework – Craven Co, NC (2011-2015)

Swan Quarter Ferry Operations Center and Sitework – Hyde County, NC (2011-2015)

 

•    Roof rainwater capture system
    -    Removes additional impervious area from point source flow into harbor
    -    Provides beneficial reuse of natural resources for toilet flushing and irrigation at new operations center


•    Stormwater infiltration
    -    Retrofit infiltration trenches into existing stormwater swale to allow more infiltration and reduce nitrogen load into harbor
    -    Routing of stormwater through overland grassy swales to allow greater infiltration and to reduce nitrogen load into harbor
    -    Routing of overflow building downspouts through planned landscaping to utilize the natural rainwater in the root systems of the native plantings


•    On-site septic system (Cherry Branch site only)
    -    Utilize LPP septic system to pressure dose the new septic field on site
    -    Designed overexcavation of trenches to provide chimneys for septic effluent to infiltrate better into the existing sandy soils layer approximately 4.5’ below the ground surface 


•    Removal of on-site septic system (Swan Quarter site only)
    -    Designed new force main to remove wastewater from current site septic system and tie to public sanitary district for treatment


•    Net Zero Discharge from Ferry Boat planning
    -    Designed ferry boat removal system whereby waste from the ferry restrooms would be pumped onto shore through a designed system and into the on-site septic system as discussed above
    -    Removing point source discharges into the river shellfish waters

 

IMG_5476.JPG
IMG_7562.JPG
Summary Block
This block is invalid. Please check the block settings and try again.
Featured
Aenean eu leo Quam
Aenean eu leo Quam

Quisque iaculis facilisis lacinia. Mauris euismod pellentesque tellus sit amet mollis.

Read more →

© 2015-2016 B&F Consulting, Inc. | Powered by Squarespace